FixOctober 14, 2026

Assemblies with production-rate labor drop in again

Adding an assembly to an estimate failed when the assembly mixed production-rate labor with anything else, such as board, studs or a sub line. The estimate showed Failed to add assembly lines and nothing was placed.

That's fixed. The assembly drops in whole, and its labor still prices from the production rate at the estimate's loaded labor rate.

Want in?

STrOp is onboarding California specialty contractors in small batches — bid through warranty in a single pipeline.

Request beta access →